Description
Description
Magtech 32 S&W Long Lead Round Nose Ammunition – 98 Grain, Sport Shooting Model
The Magtech 32 S&W Long Lead Round Nose ammunition provides a reliable and cost-effective choice for range use and plinking activities. Designed specifically for revolvers chambered in 32 S&W Long, these cartridges offer consistent performance and affordability for recreational shooters. The 98-grain lead round nose projectile ensures smooth feeding and accurate shot placement, making it ideal for target practice and training sessions. Manufactured with precision by Magtech, this ammunition adheres to high-quality standards, ensuring safety and reliability during firing. Each box contains 50 rounds, with a total of 1,000 rounds available per case, providing ample supply for extended shooting sessions. The straightforward design of these cartridges makes them suitable for beginners and experienced shooters alike, delivering dependable performance in various shooting environments. Whether you’re honing your skills or enjoying casual plinking, the Magtech Sport Shooting series offers a practical and economical option for your shooting needs.
Features:
- Caliber: 32 S&W Long for compatibility with revolvers in this chambering
- Grain Weight: 98 Grains for balanced power and accuracy
- Type: Lead Round Nose for reliable feeding and consistent performance
- Manufacturer: Magtech, a trusted name in ammunition manufacturing
- Model: Sport Shooting designed for target practice and recreational use
- Quantity: 50 rounds per box, 1,000 rounds per case for extended shooting sessions
ATTRIBUTES: 32 S&W Long, 98Gr, Magtech, Sport Shooting, Lead Round Nose, 50, 1000
BRAND: Magtech
MPN: 32SWLA
Additional information
Additional information
| Weight | 1.125 lbs |
|---|---|
| Dimensions | 4.7 × 2.5 × 1.4 in |
| caliber | 32 S&W Long |
| Grain Weight | 98Gr |
| manufacturer | Magtech |
| product_type | Lead Round Nose |
| Units Per Box | 50.0 |
| Units Per Case | 1000.0 |
| upc | 754908103010 |
| brand | Magtech |
| part_number | 32SWLA |
| Caliber | |
| Brand | Magtech |
Reviews (0)
Magtech – Magtech 32 S&W Long Lead Round Nose Ammunition – 98 Grain, Sport Shooting Model
$ 36.95
The Magtech 32 S&W Long Lead Round Nose ammunition provides a reliable and cost-effective choice for range use and plinking activities. Designed specifically for revolvers chambered in 32 S&W Long, these cartridges offer consistent performance and affordability for recreational shooters. The 98-grain lead round nose projectile ensures smooth feeding and accurate shot placement, making it ideal for target practice and training sessions. Manufactured with precision by Magtech, this ammunition adheres to high-quality standards, ensuring safety and reliability during firing. Each box contains 50 rounds, with a total of 1,000 rounds available per case, providing ample supply for extended shooting sessions. The straightforward design of these cartridges makes them suitable for beginners and experienced shooters alike, delivering dependable performance in various shooting environments. Whether you’re honing your skills or enjoying casual plinking, the Magtech Sport Shooting series offers a practical and economical option for your shooting needs.
Features:
- Caliber: 32 S&W Long for compatibility with revolvers in this chambering
- Grain Weight: 98 Grains for balanced power and accuracy
- Type: Lead Round Nose for reliable feeding and consistent performance
- Manufacturer: Magtech, a trusted name in ammunition manufacturing
- Model: Sport Shooting designed for target practice and recreational use
- Quantity: 50 rounds per box, 1,000 rounds per case for extended shooting sessions
Out of stock




There are no reviews yet.