Description
Description
Magtech 32 S&W Long Lead Wadcutter Ammunition – Sport Shooting Model, 98 Grain, Box of 50
Magtech’s 32 S&W Long Lead Wadcutter ammunition is designed for precision shooting and target practice. The Lead Wadcutter bullet shape provides enhanced accuracy and clean paper-cutting performance, making it ideal for competitive shooting and recreational use. Manufactured by Magtech, this ammunition adheres to high standards of quality and consistency, ensuring reliable performance shot after shot. The 98-grain lead projectile offers a balanced combination of velocity and accuracy, making it a popular choice among shooters aiming for tight groupings and clean paper punching.
Each box contains 50 rounds, with cases available in 1000-round quantities for range use or bulk shooting. The ammunition features a caliber of 32 S&W Long, suitable for revolvers and compatible firearms. Designed for sport shooting applications, this ammunition provides a reliable and consistent shooting experience. Whether for practice or competition, Magtech’s Lead Wadcutter rounds deliver precision, accuracy, and dependable performance.
Constructed with quality components and manufactured under rigorous standards, this Ammunition is a cost-effective choice for target shooters seeking consistent results. The Lead Wadcutter design ensures minimal barrel fouling and easy handling, making it a preferred option for precision shooting enthusiasts. Trust Magtech for dependable ammunition that meets the demands of both recreational and competitive shooters.
Features:
- Caliber: 32 S&W Long for compatibility with revolvers and other firearms
- Bullet Type: Lead Wadcutter for precise paper punching and accuracy
- Grain Weight: 98 grains provides a balanced performance
- Manufacturer: Magtech, known for quality and reliability
- Model: Sport Shooting designed for target practice and competition
- Package: Comes in a box of 50 rounds, with options for bulk cases of 1000 rounds
ATTRIBUTES: 32 S&W Long, 98Gr, Magtech, Sport Shooting, Lead Wadcutter, 50, 1000
BRAND: Magtech
MPN: 32SWLB
Additional information
Additional information
| Weight | 1.1875 lbs |
|---|---|
| Dimensions | 4.8 × 2.5 × 1.3 in |
| caliber | 32 S&W Long |
| Grain Weight | 98Gr |
| manufacturer | Magtech |
| product_type | Lead Wadcutter |
| Units Per Box | 50.0 |
| Units Per Case | 1000.0 |
| upc | 754908104017 |
| brand | Magtech |
| part_number | 32SWLB |
| Caliber | |
| Brand | Magtech |
Reviews (0)
Magtech – Magtech 32 S&W Long Lead Wadcutter Ammunition – Sport Shooting Model, 98 Grain, Box of 50
$ 36.95
Magtech’s 32 S&W Long Lead Wadcutter ammunition is designed for precision shooting and target practice. The Lead Wadcutter bullet shape provides enhanced accuracy and clean paper-cutting performance, making it ideal for competitive shooting and recreational use. Manufactured by Magtech, this ammunition adheres to high standards of quality and consistency, ensuring reliable performance shot after shot. The 98-grain lead projectile offers a balanced combination of velocity and accuracy, making it a popular choice among shooters aiming for tight groupings and clean paper punching.
Each box contains 50 rounds, with cases available in 1000-round quantities for range use or bulk shooting. The ammunition features a caliber of 32 S&W Long, suitable for revolvers and compatible firearms. Designed for sport shooting applications, this ammunition provides a reliable and consistent shooting experience. Whether for practice or competition, Magtech’s Lead Wadcutter rounds deliver precision, accuracy, and dependable performance.
Constructed with quality components and manufactured under rigorous standards, this Ammunition is a cost-effective choice for target shooters seeking consistent results. The Lead Wadcutter design ensures minimal barrel fouling and easy handling, making it a preferred option for precision shooting enthusiasts. Trust Magtech for dependable ammunition that meets the demands of both recreational and competitive shooters.
Features:
- Caliber: 32 S&W Long for compatibility with revolvers and other firearms
- Bullet Type: Lead Wadcutter for precise paper punching and accuracy
- Grain Weight: 98 grains provides a balanced performance
- Manufacturer: Magtech, known for quality and reliability
- Model: Sport Shooting designed for target practice and competition
- Package: Comes in a box of 50 rounds, with options for bulk cases of 1000 rounds
Out of stock




There are no reviews yet.